Home | Archive | About us | Contact us
 
News 
Govt Create Fund For Gas Explore «» Diesel and Kerosene Prices Reduced Tk 2 per litre «» Big Parties Pledge Increased Power Production «» Bangladesh : Fuel Price Cut Again «» Petrobangla's fresh move to raise gas price «» Today (Tuesday) Eid-ul-Azha «» No gas supply to new power plants after 2012: roundtable informed «» Bapex aims to explore 2.5-3tcf Gas in 7yrs «» Cairn, Santos Give up Gas Hunt Rights in Block no. 5 «» Bangladesh Power Sector Beset by Plethora of Woes «» Chevron's Bibiyana Heading towards a Prosperous Golden Path «» বাপেক্সের গ্যাসের দাম তিনগুণ বাড়লো «» Govt contemplating actions to resume coal extraction «» Bangladesh Power Situation may Improve Soon «» Petrobangla Asked to Submit Position Paper over Cairn’s Gas Sales Right «» Barapukuria coal Mine: Affected Families to get Compensation «» Dhaka Keen to Buy Crude Oil from Iran «» Road march planned to resist offshore deals with IOCs «» Muhith Calls on NRBs to Invest in Power «» ddd «» Villagers withdraw Barapukuria coal mine besiege programme
  Search     [Advance Search]
 
    NAVIGATION  
  Gas Production
  Power Generation
  Power Sector
  EB Report
  Green Page
  About Bangladesh
  Petroleum sector
  Gas Sector
  Something to Say
  Coal Sector
  Regional Energy
  Micro Hydro Power
  RSS Article










 
EB Report
 
Production Resumes at Barapukuria Coal Mine

Monday, 03.09.2009, 06:54pm (GMT)

Coal production resumed at Barapukuria coalmine Saturday midnight without digging the boreholes as Bangladeshi miners agreed to join work.

Official sources said at least 550 metric tons of coal has been extracted as a test case from 1114 coalface after miners joined work following a meeting with the authorities of Barapukuria Coal Mining Company Ltd (BCMCL).

Coal production was suspended after villagers affected by landslide at and around the mining site resisted drilling of boreholes for production of coal from “1114 Face” on February 25 over compensation issue.

The crisis deepened further when Bangladeshi miners Friday night called work abstention for an indefinite period protesting their retrenchment.

CMC-XMC, the contractor company of Barapukuria, retrenched 800 Bangladeshi miners on Thursday without prior notice, sparking protest from them.

The CMC-XMC also put a deadline to resume coal production from March 5 otherwise it threatened to stop its activities in Bangladesh .

Following the threat, Forest and Environment State Minister Mostafizur Rahman Fizar visited the coalmine area and held several meetings with the villagers and the miners. He assured the villagers of giving them compensation to overcome the crisis.

The CMC-XMC later agreed on reinstating the miners.


Comments (0)        Print        Tell friend        Top


Related Articles:
» Mining Resumes at Barapukuria
» Safety Maintaining Work Starts at Barapukuria Coal Mine
» Barapukuria Coalmine Siege Called Off
» Open Pit Mining of Coal Opposed
» Bangladesh should extract energy from coal mines: Expert
» Villagers withdraw Barapukuria coal mine besiege programme
» Villagers Besiege Barapukuria Coalmine over Compensation
» Bangladesh’s Barapukuria still in limbo
» 'No Hasty Decision Regarding Bangladesh Coal Policy'
» Lawmaker Suggests Open-pit Mining of Coal in Phulbari
» Pilot Project for Open Pit Mining on the Cards
» Coal mine cave-in kills 1, 3 still trapped in Bangladesh
» Coalminers Call off Strike
» Bangladesh: Barapukuria Miners Start Indefinite Strike
» Bangladesh Govt to Install 100-200MW Wind-based IPP
» Bangladeshi Coal Miners Go on Strike
» Bangladesh Coal Company Want Acquire More Land
» Survey on Social, Environmental Impacts of Coal Mining not yet Conducted
» Govt Revise Policy for Power Generation : Committee Formed
» Energy Bangla Exclusive: Hasina Needs Convincing Information on Coal Mining
» PM Asks Energy Ministry to Review Coal Policy Further
» PDB Selects 20 Sites for High-cost Rental, Peaking plants
» Potential for Coal Bed Methane in Bangladesh
» JS panel suggests speedy approval of coal policy
» Petrobangla proposal to Export Coal Rejected
» Experts’ Suggest Coal Export in ‘Special Circumstances’
» Coal Policy of Bangladesh–NRB Brain Storming
» PM for human-friendly tech in extracting coal
» Coal Mining Challenges of Bangladesh (Part – 5)
» Army Deployed at a Coal Mine in Bangladesh
» Coal Mining Challenges of Bangladesh (Part – 4)
» Coal Mining Challenges of Bangladesh (Part – 3)
» Coal Mining Challenges of Bangladesh (Part – 2)
» Coal Mining Challenges in Bangladesh [Part -1 ]
» Hasina for Quick Decision on Coal Policy
» Barapukuria coal Mine: Affected Families to get Compensation
» Policy on compensation for coalmine victims soon
» Bangladesh Govt Report which Terms Phulbari Deal Illegal Goes Missing
» Gary Lye Now Chairman of Asia Energy Bangladesh
» Govt contemplating actions to resume coal extraction
» Bangladesh: New Method to Avert Row over Coal Mining
» Make List of Families Affected by Barapukuria: Hasina
» Govt has 'no mining lease deal with any foreign firm'
» New law for compensation of the affected people at coalmine
» Coal Policy Unlikely on Lack of Time: Tamim
» Bangladesh Coal Policy Finalisation Brooks No Setback
» Barapukuria Coal Production Twice Over
» World Coal Market Situation & Bangladesh
» Draft Coal Policy to be Revised
» Petrobangla Wants to Hike Coal Price
» Coal Policy to be placed before Bangladesh Cabinet Again
» Draft Coal Policy Sent to Cabinet Division
» Bangladesh Coal: Amendment of Rules before Approving Policy will take Time
» Land Subsides Again in B'pukuria Mine Area
» Army Asking Phulbari People to Leave Project Site: Activist Alleges
» Bangladesh Urged to Tap Coal Before Gas Runs Out
» Gas Import from Myanmar, Qatar too costly: Special Aide Dr Tamim
» Asia Energy to Wait Govt Approval of Phulbari Coal Mine Project
» Coal Policy of Bangladesh will be Finalized Soon
» Petrobangla Gets License for First Time to Explore Coal in Joint Venture
» Bangladesh Govt. to Form New Review Committee to Scan Draft Coal Policy


Other Articles:
Global Financial Market Losses Reach $50 Trillion, Says Study (03.09.2009)
WB to Help Mobilise FDI for Energy, Power Sector (03.08.2009)
Chinese Operator's Ultimatum to Bangladesh Govt (03.02.2009)
LPG, Furnace Oil Prices Likely to be Cut (03.02.2009)
Exclusive Picture of Bangladesh Mutiny with Update (02.28.2009)
Bangladesh: Slash Diesel & Kerosene Price, Peoples Demand (02.25.2009)
Bangladesh Prime Minister Ordered to Ensure Power Supply for Farmers (02.24.2009)
Bangladesh Power Sector Beset by Plethora of Woes (02.23.2009)
Tk 3000 cr Japanese Loan for Power Dev, Bridges (02.23.2009)
WB Seeks Ideas to Improve Nutrition in Bangladesh (02.22.2009)



 
  ::| Topic Download

  All right reserved © energybangla.com || developed by [Top Page]