Energy Bangla

Energy electricity and environment news portal

Dhaka Friday,  Mar 29, 2024

Rooppur: Transport Lock Installed For Loading And Unloading Of Fuel

Installation of the Transport Lock has been completed in the Power Unit 1 of the reactor building of Rooppur NPP. The Transport Lock will be used for the loading of nuclear fuel and its unloading at the power plant.

The transport lock is 12.7 meters in length and 10 meters in width, and it weighs 235 tons. It is one of the biggest pieces of equipment on the project in terms of dimension. After the NPP start-up, fuel simulators will be delivered through the lock, and it will ensure full maintenance of the reactor.

“Installation of the transport lock in the design position is an important stage for the completion of civil works in the reactor compartment building,” said Alexei Deriy, ASE Vice President and Director of the Rooppur NPP Construction Project.
Further work on the assembly and adjustment of the transport lock will be carried out after the jacketing of the power unit 1 dome.

Rooppur NPP equipped with two VVER-1200 reactors with a total capacity of 2400 MW is being constructed under the Russian design. VVER 1200 is an evolutionary generation III+ design that fully complies with all the international safety requirements. The Engineering Division of Rosatom State Corporation is implementing the project as the General Contractor.

Commenting is closed here